Projects completed

Cambodia Sihanoukville 1x150 MW Power Plant Cambodia Sihanoukville 1x150 MW Power Plant
Introduction

Construction investment, Sihanoukville 1x150MW Power Plant will be built adjacent to the existing CEL I 100 MW coal-fired power plant, which located in the coastal of Stung Hav District, Preah Sihanouk Province, Kingdom of Cammbodia. Owned Cambodia Energy II Co., Ltd (CEL2) is the preferred bidder for the project, which was decided by the government of Cambodia.
The objective of the project is the construction of new 150 MW coal- fired plant and a jetty for coal ship. The new coal fired power plant in Sihanoukville is an additional installed capacity to substitute for the Stung Cheay Areng Hydro project. The power plant is expectedly completed by late 2019.
View more
Phu Dinh apartment building Phu Dinh apartment building
Introduction
Phu Dinh apartment building was built at ward 10, district 6, Ho Chi Minh City by Resco as an investor
View more
Gas pipeline Block B - O Mon Gas pipeline Block B - O Mon
Introduction
Southwest Pipeline Operating Company (SWPOC) plans to build and develop the project gas pipeline Block B - O Mon transport natural gas from mines Block B & 52, other mines (if any) to consumer households in the provinces of Kien Giang, Ca Mau and Can Tho. The investment objective of the project is to contribute to the development of economic and to ensure supply of gas/electricity in the southwestern province, Vietnam.
View more
Ho Chi Minh City Urban Railway Construction Ben Thanh – BX Mien Tay (Line 3A) Ho Chi Minh City Urban Railway Construction Ben Thanh – BX Mien Tay (Line 3A)
Introduction
  • Total length: 9.7 km underground.
  • Number of station: 10 underground stations.
  • Total investment cost (estimated): 1.82 bill USD.
View more
Second Ho Chi Minh City Water Environment Improvement Project - Package J: Expansion of Wastewater Treatment Plant Second Ho Chi Minh City Water Environment Improvement Project - Package J: Expansion of Wastewater Treatment Plant
The Second Ho Chi Minh City Water Environment Improvement Project - Package J: Expansion of Wastewater Treatment Plant was built in the Binh Hung Commune, Binh Chanh District, Ho Chi Minh City.
View more
Kien Long Commercial Joint Stock Bank Kien Long Commercial Joint Stock Bank
Introduction
  • Network operation: 103 branches and transaction offices nationwide
  • Establishment permit: No. 0056 / NH-GP dated 09/18/1995 of the Governor of the State Bank of Vietnam. On 10/27/1995, Kien Long Bank officially put into operation.
  • Certificate of enterprise registration: Registration for the first time October 10, 1995, registered change 36th, July 22, 2015.
  • Main activity: Mobilizing short, medium and long-term capital in the form of savings deposits, demand deposits, certificates of deposit, receive capital investment trusts, funds received from credit institutions and foreign. Providing short, medium and long term, investment in economic institutions, payment service among business customers of foreign currency, international payments, investment in securities, provide investment services and debt management services to mining assets and provide other banking services.
View more
Page 1 of 14 1 2 3 4 5 6 7 8 9 10 »